|
Smith and
Hughes may have the best marketing
team in the oil patch, but for technology and performance
they are no match for TRI-MAX Industries!
Case History:
Mustang Island Block
A-51, we proposed to the operator 12 1/4" x 14 3/4" EWD and
ES to drill the intermediate section of the hole. The
nearest offset well, drilled in 1982, is more than 10 miles away.
We estimated it will take two EWDs to drill the 3100 ft.
@ 15 ft/hr. We were conservative.
Smith proposed
ONE of their new Bi-center bits to drill the entire section at 25
ft/hr.
Hughes proposed
their RWDs.
It took TWO Smith
Bi-centers to drill the top soft 1246 ft of hole in 146 hours (8.5
ft/hr) and an additional Hughes RWD to drill another 244 ft in 101
hours (2.4 ft/hr). All of these tools pulled 100% wornout.
Finally, the operator
gave our EWD a chance. We picked where the RWD
was drilling less than 3 ft/hr to drill more than 30 ft/hr with
our EWD. We drilled the toughest 686 ft. in 46 hours (15 ft/hr)
keeping the hole angle below 1°. An isolated incident?
Hardly! In a directional well in Main Pass Block it took
six RWDs to match the footage drilled by ONE EWD, and we
have much more to show you.
We cannot dream to
match the marketing power of Smith and Hughes, but we survive and
grow by innovation and performance.
We know you never
have the time to see every salesman, read every piece of mail, or
check every website. Give us a call and we promise to give
you performance worth the time you spend with us.
|