In the previous well, the Bi-Center ate our lunch.  It drilled only 1500 ft. and took off 24°.

The EWD did a hell of a job.

It drilled 4315 ft.  The hole is perfect gauge.

How much did the EWD save Trans Texas?  Ask Sam!!!

Sam Jones
Trans Texas Supervisor
(409) 355-2590